| The research institute, JCMMRI, was established on October
8, 1964 as an affiliated organization of Japan Construction
Mechanization Association. The purpose of its establishment
is to contribute to our nation's economic development by promoting
technology improvement and rationalization of construction projects
through tests and researches in the area related to construction
machinery and mechanized construction works.Ever since the establishment,
we have been carrying out various tests. |
 |
|
| ‘ |
MAIN ITEMS OF ACTIVITY
|
| Research |
| |
Research on construction method for road,
tunnel, bridge, dam, river, coast |
| |
Research on maintenance and repair of structures |
| |
Research on construction machinery and ICT-aided
construction |
| |
Research on environmental assessment |
| Development |
| |
Development of new models, new construction
methods and new materials |
| |
Development of maintenance and repair methods |
| |
Development of recycling and environmental
preservation technology |
| |
Development of new construction equipments |
| |
Development of ICT-aided construction system |
| Testing |
| |
Large-scale fatigue testing of steel and
concrete structures |
| |
Large-scale model experiments on various
structures |
| |
Field diagnosis technology of structures |
| |
Testing of aggregate crushing technique |
| Construction machinery |
| |
Performance and utility tests on construction
machinery and snow removing machinery |
| |
Development of all kinds of construction
equipments |
| |
Development of safety enhanced and environmental
enhanced construction machinery |
| |
ROPSEFOPSETOPS performance tests |
| Technical consultations |
| |
Technical advice on construction machinery
and ICT-aided construction |
| |
On-site technical advice for bridge, tunnel
and slope construction |
| |
Technical advice for survey and design |
| Evaluation, Certification |
| |
Evaluation and certification for newly developed
construction machinery |
| |
Evaluation for low exhaust gas of engines
and black smoke purifying devices |
| |
Designation for standard operation
system of construction machines |
| |
Certification for low-noise,
low-vibration of construction machines |
| |
Performance test of water jet
robot for removal of damaged concrete New technology development
commitee |
| New technology
development committee |
| |
Cooperation with academic and industry experts
for new technology development |
|
|
| ‘ |
MAIN FACILITIES |
Area:@150,000@sq.m
Indoor facility : Main building,
Laboratories No.1, No.2 and No.3, Material testing facility,
ROPS testing facility, Laboratory for large scale fatigue tests
Outdoor facility : Test course,
Test field, Water pool, Slope course, Sand field, Poor grand
field, Asphalt paving field, Sound power level measuring field,
Aggregate production plant, ICT-aided construction and Safety Training Center
@ |
|
|
|
|